Product Details:
Payment & Shipping Terms:
|
Certification: | ISO 9001 | Maximum Capacity: | 20m3/h |
---|---|---|---|
Material: | Stainless Steel Or Carbon Steel | Service Life: | > 20 Years |
Operation: | 24 Hours Automatic Running | Delivery Time: | 30 Work Days |
High Light: | copper concentrate machine,flotation machines,20m3/h Flotation Separator |
Gold Mining Flotation Separator And Beneficiation Plant With Higher Output:
Introduction of Gold Mining Flotation Separator And Beneficiation Plant
The impeller has a double-sided blade with backward tilting, which can realize double circulation of slurry in the tank; the gap between the impeller and the cover plate is large, and the air intake is large; the circumferential speed of the impeller is low, and the life of the wearing parts is long; the forward inclined groove body has a small dead angle , foam movement speed; large inspiratory capacity, low energy consumption; long life of wearing parts; conducive to coarse-grain mineral flotation; mechanical agitation, self-priming, self-priming slurry.
Working principle of Gold Mining Flotation Separator And Beneficiation Plant:
The working principle of the HK flotation separator, when the impeller rotates, the slurry in the upper and lower impeller chambers generates centrifugal force under the action of the upper and lower blades and is twisted to the periphery, so that a negative pressure zone is formed in the upper and lower impeller chambers. At the same time, the slurry in the upper part of the cover plate is sucked into the upper impeller cavity through the circulation hole on the cover plate to form a slurry circulation. When the lower blade pulls out the slurry around, the lower slurry is replenished to the center, thus forming a lower circulation of the slurry. The air is sucked into the upper impeller chamber through the suction pipe and the central cylinder, and is mixed with the sucked slurry to form a large number of fine bubbles, which are uniformly dispersed in the groove through the cover plate to form mineralized bubbles. The mineralized bubbles float up to the foam layer and are scraped off by the scraper to form a foam product.
Principle of Selecting Floatation Separator:
(1) An appropriate flotation separator should be selected according to the nature of the ore (such as selectability, selected particle size, density, grade, pulp, pH, etc.). In the case where the ore is relatively easy to select and the aeration volume is not required, a mechanical stirring flotation machine can be selected. In the case of coarse ore beneficiation, KYF, BS-K flotation machines and CLF coarse flotation separators are available. When the ore is easy to be selected, the selection size is fine, the grade is high, and the pulp Ph is low, a relatively high ore-rich flotation column can be selected (especially suitable for beneficiation operations).
(2) The flotation separator with corresponding specifications should be selected according to the scale of the plant. Generally speaking, large-scale flotation plants should use large-scale flotation machines, medium and small plants should use medium- or small-scale flotation machines, and the specifications and quantities of flotation machines should be determined through technical and economic comparisons.
(3) The selection operation is mainly to improve the concentrate grade. The flotation foam layer should be thinner in order to separate the gangue. It is not appropriate to use a large-scale flotation machine. Therefore, the flotation machine used for the selection operation should be used with coarse and The flotation machine used in the selection operation is different.
Technical Data of Flotation Separator:
Model | Capacity | Power(kw) | Dimension(m) | Pipe connection(DN) | ||||||
(m3/h) | Recycle pump | Air compressor | Skimming system | L/L1 | W/W1 | H/H1 | (a) Water inlet | (b) water outlet | (c) sludge outlet | |
HK-002 | 1~2 | 0.75 | 0.55 | 0.2 | 3.2/2.5 | 2.4/1.16 | 2.2/1.7 | 40 | 40 | 80 |
HK-003 | 1~3 | 0.75 | 0.55 | 0.2 | 3.5/2.8 | 2.4/1.16 | 2.2/1.7 | 80 | 80 | 100 |
HK-005 | 1~5 | 1.1 | 0.55 | 0.2 | 3.8/3.0 | 2.4/1.16 | 2.2/1.7 | 80 | 80 | 100 |
HK-010 | 1~10 | 1.5 | 0.55 | 0.2 | 4.5/3.8 | 2.7/1.36 | 2.4/1.9 | 100 | 100 | 100 |
HK-015 | 1~15 | 2.2 | 0.75 | 0.2 | 5.5/4.5 | 2.9/1.6 | 2.4/1.9 | 100 | 100 | 100 |
HK-020 | 1~20 | 3 | 0.75 | 0.2 | 5.7/4.8 | 3.2/2.2 | 2.4/1.9 | 150 | 150 | 150 |
HK-030 | 1~30 | 3 | 0.75 | 0.2 | 6.5/5.5 | 3.2/2.2 | 2.5/2.0 | 150 | 150 | 150 |
1. Quality control
All the equipment offered are produced by China national standard drawings, nonstandard equipment will be produced by the drawings confirmed by clients. Clirik Machinery strictly follows ISO 9001: 2008 Quality management system. Most equipment will be test for at least 8 hours in the factory before delivery. There is record in computer for each equipment, spares can be easily confirmed when it is necessary.
2. Way of payment
Various ways of payment, T/T, against copy of B/L, L/C, D/A, D/P, West union, etc. All can be negotiated.
3. Delivery time
Normal delivery time within 10 to 30 working days, complete production line or larger equipment may take longer. Exact delivery shall be confirmed when place the order.
4. Trade terms
Typically EXW, FOB, CIF, CFR, DAF follows International Rules for the Interpretation of Trade Terms 2010(INCOTERMS 2010).(you are also welcome to take the rule of Alibaba Trade Assurance)
5. Shipping lines
Priority rule based on clients' request, and freight cost, service, shipping date, date of arrival shall be considered.
6. Installation
Clirik has several experienced technicians with passports ready to go for installation, when installation service is needed, the client should pay for technicians’ round way air tickets, salary(shall be confirmed before leaving), food and lodging, most importantly to guarantee the technicians’ safety.
7. Equipment warranty
18 months warranty, can be extended to 12 months as request.
Contact Person: Henry
Tel: +86 188 9987 6785